1. Introduction
The APT Preparatory Group for ITU World Telecommunication Standardization Assembly (APT WTSA) consists of a number of Working Groups (WGs) that are responsible for the regional preparation on the issues related to WTSA. This document proposes the following WGs for the APT WTSA-24 cycle for the preparatory work for WTSA-24. Furthermore, it also proposes the Terms of Reference of each proposed Working Group to be submitted to the Plenary for consideration.
2. Proposed Structure for the APT Preparatory Group for WTSA-24
The following three WGs are proposed for the APT Preparatory Group for WTSA-24:
1. Working Group 1 (WG1): ITU-T Working Methods
2. Working Group 2 (WG2): ITU-T Work Organization
3. Working Group 3 (WG3): Regulatory/Policy and Standardization Related Issues
The Terms of Reference of each Working Group are as follows:
2.1 Working Group 1 (WG1): ITU-T Working Methods
WG1 considers the activities related to the Working Methods of ITU-T. Proposed Terms of reference of WG1 are:
• To identify the issues and consideration of the proposals related to the Working Methods of ITU-T for implementation of the ITU work program to strengthen cooperation between ITU-T and other SDOs, and intra-ITU collaboration and coordination;
• To review the proposals regarding the ITU-T Resolutions and ITU-T A-Series Recommendations and other issues related to the Working Methods of ITU-T;
• To consider any other issues assigned by the Plenary or referred to the Group by other APT Preparatory Groups.
2.2 Working Group 2 (WG2): ITU-T Work Organization
WG2 considers the activities related to the organization of work of ITU-T such as the structure of ITU-T Study Groups to be studied in ITU-T and TSAG. Proposed Terms of reference of WG2 are:
• To consider proposals on the programme and organization of the work of ITU-T consistence with ITU-T strategies and priorities;
• To identify issues and considerations of the proposals related to the structure of ITU-T Study Groups;
• To consider proposals related to the review the Questions for study, allocation of the Questions and the actions required for further processing;
• To review the proposals regarding the ITU-T Resolutions and Recommendations related to the Working Organizations of ITU-T;
• To consider any other issues assigned by the Plenary or referred to the Group by other APT Preparatory Groups.
2.3 Working Group 3 (WG3): Regulatory/Policy and Standardization Related Issues
WG3 considers the standardization related issues such as Regulatory/Policy, Strategic Plan and ITU-T operation issues other than the Working Methods and Work Organization of ITU-T. Proposed Terms of reference of WG3 are:
• To identify issues and consider proposals on area of the strategic standardization ;
• To identify issue and consider proposals related to the particular need of the developing countries and bridging standardization gap;
• To review the proposals regarding the ITU-T Resolutions and Recommendations related to Regulation/ Policy and Standardization related issues;
• To consider any other issues assigned by the Plenary or referred to the Group by other APT Preparatory Groups.
Office Bearers of APT WTSA-24
Chair
Dr. Hyoung Jun Kim (Republic of Korea)
Vice-Chairs
Dr. Hideyuki Iwata (Japan)
Ms. Tripti Saxena (India)
Mr. Xu Heyuan (People’s Republic of China)
Mr. Behzad Ahmadi (Islamic Republic of Iran)
Working Group |
Chair |
Vice-Chairs |
WG1: ITU-T Working Methods |
Mr. Hiroshi Yamamoto (Japan) |
Ms. Minah Lee (Republic of Korea) |
WG2: ITU-T Work Organization |
Dr. Kangchan Lee (Republic of Korea) |
Ms. Miho Naganuma (Japan) |
WG3: Regulatory/ Policy and Standardization Related Issues |
Mr. Li Cheng (People’s Republic of China) |
Ms. Eriko Hondo (Japan) |
Meetings:
The 5th Meeting of APT Preparatory Group for WTSA-24 (APT WTSA24-5), 19-23 August 2024, Thailand
The 4th Meeting of APT Preparatory Group for WTSA-24 (APT WTSA24-4), 25-28 June 2024, Adelaide, Australia
The Virtual Interim Meeting of Working Group 3 of the APT WTSA-24 (APT WTSA24-WG3-IM-1), 27 - 29 May 2024, Virtual
The 3rd Meeting of APT Preparatory Group for WTSA-24 (APT WTSA24-3), 30 April - 2 May 2024, Siem Reap, Cambodia
The 2nd Meeting of APT Preparatory Group for WTSA-24 (APT WTSA24-2), 5-6 February 2024, Virtual/Online Meeting
The 1st Meeting of APT Preparatory Group for WTSA-24 (APT WTSA24-1), 21 April 2023 - Bangkok, Thailand
Related Links
APT Preparatory Group for WTSA-20
APT Preparatory Group for WTSA-16
APT Preparatory Group for WTSA-12