SATRC Action Plan Phase V (SAP-V) was adopted by the 15th Meeting of SATRC (SATRC-15) held on 5-7 August 2014 in Paro, Bhutan for the implementation period 2015 -2016. SAP-V was successfully implemented in time frame and its' completion was reported to the 17th Meeting of SATRC (SATRC-17) held on 4 - 6 October 2016 in Dhaka, Bangladesh.
SAP-V was implemented through the two SATRC Working Groups (WG). Each WG was assigned with a number of Work Items. The WGs are:
The list of the experts who worked for the implementation of SATRC Action Plan Phase V is available here.
Outcomes:
The WGs of SATRC worked on 8 Work Items during the implementation of SAP-V and developed SATRC Reports on the Work Items as outcomes. The outcomes were approved by the SATRC-17. The outcomes are listed below.
Report No. | Title of the Report |
SAPV-REP-01
|
|
SAPV-REP-02
|
SATRC Report on Regulatory and Technical Aspects of OTT
|
SAPV-REP-03
|
SATRC Report on Emerging Licensing framework including exist and relicensing policy
|
SAPV-REP-04
|
SATRC Report on International connectivity for provisioning of broadband services |
SAPV-REP-05
|
SATRC Report on Spectrum Requirement Estimation for IMT Systems in SATRC Countries
|
SAPV-REP-06
|
SATRC Report on Non-Ionizing Radiation Safety in the Frequency Bands used for Mobile Phones |
SAPV-REP-07
|
SATRC Report on Role of Network Sharing for SATRC Countries: From Passive Infrastructure Sharing to Mobile Virtual Network Operation
|
SAPV-REP-08
|